Project of the Month: Haverhill, MA

IMG_4137This month’s project is a big job we’re doing in Haverhill, MA. It’s a Craneboard Insulated Siding job for the main part of the home, and we’re adding windows in various places. We’re adding 3 windows, all side by side, on the rear of the home, plus 3 basement windows, and 2 windows- one on either side of the sliding patio door.
The photos here show the early progress of preparing the area for the door install. We focus on making sure there’s no rot at all, and that the area is perfectly clean and free of moisture. We don’t ever want a problem with water down the road.
As we go forward into the rest of the job, we’ll update with more pictures and stories…come back soon!